Role
Civil Engineering Contractor, Builder, Permit Procurement (Emergency Construction Permit to save residence)
Overview
Faced with a dramatically eroded coastal property, we undertook a nine-month restoration project to preserve this spectacular oceanfront site. We moved over 2,500 cubic yards of material, installed 180 linear feet of engineered retaining walls, and performed comprehensive foundation work. This project was a battle against the elements, a successful effort to stabilize and restore a piece of the California coastline for generations to come.
Album
18 Photos